RTP Painting Programme 2014

WMS were delighted to win via competitive tender the above
works and to work closely with  Surveyors   RTP who have offices in Falmouth and Bodmin. http://www.rtpsurveyors.co.uk/

Read more

Torrington Town Hall

WMS are proud to be principal contractors for the completion of phase 1 &2 of the 5 phased renovation of Great Torrington Town Hall.

Read more

Ethelwynne Brown Close

Ethelwynne Brown Close formed part of an External Cyclical Repair Programme valued at in excess of £500,000. The site is prestigious; being highly visible from the tourist magnet of the town of Bideford’s quayside and as such colour impact and finish was critical.

Read more

Home Improvements

"It's fair to say that there are an awful lot of companies out there that fit kitchens and bathrooms, and we're no exception. However, for a change we thought you'd like to see something a little different.

Read more

State of the art surface cleaning

"WMS have committed significant investment into state of the art surface cleaning equipment in a bid to offer significant savings to their extensive range of Housing providers."

Read more

Parke House

WMS were proud to be contracted to repair the portico and generally redecorate the exterior and partially decorate the interior of this impressive 17th Century building.  It was a massive undertaking to ensure we preserved the integrity of the building whilst making improvements and repairs; all whilst the site was fully operational.

Parke House near Bovey Tracey is a two storey Grade II Listed Building owned by The National Trust and houses the administrative headquarters for the Dartmoor National Park Authority. The project commenced in the summer of 2017. 

The works consisted of lime mortar repairs to the roof of Parke house.  We also removed moss and repaired the lead to ensure the roof was restored and left in good condition. 

The next phase was to repair, clean, prepare and paint the front elevation – a period colour was applied, as per discussion with the client.

The final phase was to erect internal scaffolding to clean, prepare and paint internal communal areas namely the entrance and stairwell.  All works were completed whilst the site was fully operational with WMS closely liaising with the client to ensure that any disruption was kept to an absolute minimum.

Parke House is a beautifully restored Headquarters building and WMS were proud to help facilitate its ongoing preservation