WMS has completed a programme of improvement works at Flushing Church of England Primary School, with the project carefully scheduled for the summer holidays to minimise disruption to pupils and staff.
The programme included various mechanical and electrical works alongside significant improvements to the school's outdoor environment, including preparation and resurfacing of the playground.
The playground works were delivered by our specialist sub-contractor partner DCM Surfaces, with Dani Tomas acting as our key point of contact.
A new wet pour surface was installed, providing the school with an affordable, slip-resistant and low-maintenance solution designed to offer excellent durability in a busy playground environment.
Wet pour is a two-part system in which surface granules are blended with polyurethane resin to produce a strong surface with excellent tensile strength. The base course is made predominantly from recycled truck tyre rubber, helping incorporate recycled materials into the finished installation.
The system can also provide important safety benefits around playground equipment. The depth of the base course can be specified according to the requirements of the area, providing shock absorption and critical fall-height compliance where necessary.
By delivering the programme during the summer holidays, WMS and our project partners were able to progress the works while the school was unoccupied, reducing disruption and ensuring the improved facilities were ready for pupils returning for the new term.
The completed project provides Flushing Church of England Primary School with a refreshed, practical and durable playground alongside the wider mechanical and electrical improvements delivered across the school.
A fantastic collaborative effort from WMS, DCM Surfaces and everyone involved in delivering the project.


Back to All News